|
Questa
provided storm water, hydrologic, and wastewater engineering services for this
housing project, which includes several small single-family residences, low-cost
rental units, a small farm, public restrooms, parking facilities, and a small
commercial lot. We prepared the analysis and design for infiltration drainage
and wetland enhancement to minimize effects on town storm drainage facilities.
The infiltration drainage systems included shallow sedimentation-settling
basins, infiltrator trenches, and grass infiltration swales for collection,
treatment, and subsurface dispersal of runoff from roof downspouts, parking
areas, and roadways. We also conducted extensive soil, groundwater, and
percolation testing. The facilities include a mix of individual and cluster
systems, combining conventional designs, pressure-dosed systems, and mounds.
Questa completed cumulative nitrogen loading and groundwater mounding studies to
verify site suitability and appropriate development density. We installed
eight deep monitoring wells and completed a hydrogeologic investigation for
environmental analysis of the project on local groundwater resources. The
project, developed in an iterative planning process involving project planner,
architects, civil engineer, and public groups, went into construction in 2004. |